| 序号 |
电厂名称 |
机组编号 |
机组容量 |
本月发电量
(万Kwh) |
本月发电能力
(万Kwh) |
本月机组等效负荷率(%) |
前7月累计机组等效负荷率(%) |
前7月累计机组冷备用
小时数 |
说明 |
| 燃煤机组 |
| 单机容量≥60万千瓦 |
| 1 |
滇东电厂 |
#1 |
600MW |
34149.59 |
44640 |
76 |
77.75 |
141.12 |
|
| 2 |
#2 |
600MW |
0 |
44640 |
0 |
59.2 |
1099.66 |
云南来水大,火电机组安排停机备用 |
| 3 |
#3 |
600MW |
24514.24 |
42727.8 |
57 |
74.51 |
386.65 |
云南来水大,火电机组安排调峰 |
| 4 |
#4 |
600MW |
969.45 |
44640 |
2 |
67.35 |
971.86 |
云南来水大,火电机组安排调峰 |
| 5 |
发耳电厂 |
#1 |
600MW |
13192.11 |
20257.8 |
65 |
70.05 |
150.9 |
|
| 6 |
#2 |
600MW |
33318.25 |
44275.2 |
75 |
79.93 |
0 |
|
| 7 |
#3 |
600MW |
0 |
0 |
0 |
66.68 |
967.11 |
计划检修 |
| 8 |
#4 |
600MW |
33016.48 |
44640 |
74 |
10.82 |
0 |
|
| 9 |
防城港电厂 |
#1 |
630MW |
34319.23 |
42504.21 |
81 |
76.74 |
674.52 |
|
| 10 |
#2 |
630MW |
12597.53 |
16600.5 |
76 |
77.79 |
627.57 |
|
| 11 |
贵港电厂 |
#1 |
630MW |
31846.89 |
42533.19 |
75 |
87.52 |
0 |
|
| 12 |
#2 |
630MW |
24125.33 |
31108.77 |
78 |
85.19 |
0 |
|
| 13 |
盘南电厂 |
#1 |
600MW |
33848.32 |
42988.8 |
79 |
67.73 |
827.24 |
|
| 14 |
#2 |
600MW |
35134.78 |
43924.8 |
80 |
75.13 |
271.52 |
|
| 15 |
#3 |
600MW |
0 |
0 |
0 |
80.99 |
85.23 |
计划检修 |
| 16 |
#4 |
600MW |
0 |
0 |
0 |
65.85 |
573.72 |
计划检修 |
| 17 |
桥口电厂 |
#1 |
650MW |
30892.07 |
36370.75 |
85 |
79.09 |
0 |
纳入西电东送计划 |
| 18 |
#2 |
650MW |
42138.68 |
48360 |
87 |
77.41 |
532.09 |
同上 |
| 19 |
阳西电厂 |
#1 |
600MW |
40085.6 |
44640 |
90 |
92.23 |
0 |
|
| 20 |
#2 |
600MW |
38189.36 |
44463 |
86 |
86.77 |
0 |
|
| 21 |
雨汪电厂 |
#1 |
600MW |
21891.6 |
35262 |
62 |
79.23 |
78.3 |
云南来水大,火电机组安排调峰 |
| 22 |
#2 |
600MW |
27517.63 |
44640 |
62 |
76.18 |
170 |
云南来水大,火电机组安排调峰 |
| 小计 |
67.4 |
73.07 |
|
|
| 30万千瓦≤单机容量<60万千瓦 |
| 23 |
鲤鱼江电厂 |
#1 |
315MW |
20796.39 |
23362.92 |
89 |
84.26 |
136.82 |
纳入西电东送计划 |
| 24 |
#2 |
315MW |
20761.63 |
23233.77 |
89 |
85.22 |
13 |
同上 |
| 小计 |
89.19 |
84.74 |
|
|
| 燃煤机组合计 |
68.66 |
73.60 |
|
|
| 燃气机组 |
| 1 |
- |
- |
|
|
|
|
|
|
|
| 燃气机组合计 |
|
|
|
|
| 燃油机组 |
| 1 |
- |
- |
|
|
|
|
|
|
|
| 燃油机组合计 |
|
|
|
|
| 水电机组 |
| 单机容量≥60万千瓦 |
| 1 |
构皮滩电厂 |
#2 |
600MW |
20321.44 |
44640 |
46 |
16.37 |
|
|
| 2 |
#3 |
600MW |
22131.22 |
44640 |
50 |
23.94 |
|
|
| 3 |
#4 |
600MW |
22756.17 |
44640 |
51 |
22.16 |
|
|
| 4 |
#5 |
600MW |
23714.48 |
44640 |
53 |
22.67 |
|
|
| 5 |
龙滩电厂 |
#1 |
700MW |
17747.95 |
51737 |
34 |
16.23 |
|
|
| 6 |
#2 |
700MW |
26361.6 |
51842 |
51 |
22.62 |
|
|
| 7 |
#3 |
700MW |
16825.6 |
51846.9 |
32 |
22.53 |
|
|
| 8 |
#4 |
700MW |
25802.91 |
51835 |
50 |
20.46 |
|
|
| 9 |
#5 |
700MW |
22182.9 |
51870 |
43 |
21.78 |
|
|
| 10 |
#6 |
700MW |
25355.56 |
51780.4 |
49 |
21.31 |
|
|
| 11 |
#7 |
700MW |
27518.58 |
51744 |
53 |
21.1 |
|
|
| 12 |
小湾电厂 |
#1 |
700MW |
36203.08 |
52080 |
70 |
43.17 |
|
|
| 13 |
#2 |
700MW |
36035.68 |
52080 |
69 |
45.58 |
|
|
| 14 |
#3 |
700MW |
36531.06 |
52080 |
70 |
45.69 |
|
|
| 15 |
#4 |
700MW |
36530.85 |
52080 |
70 |
17.07 |
|
|
| 小计 |
52.84 |
25.79 |
|
|
| 30万千瓦≤单机容量<60万千瓦 |
| 16 |
天一电厂 |
#1 |
300MW |
7484.09 |
22320 |
34 |
16.26 |
|
|
| 17 |
#2 |
300MW |
3091.92 |
20180.4 |
15 |
16.45 |
|
|
| 18 |
#3 |
300MW |
9253.72 |
22320 |
41 |
32.59 |
|
|
| 19 |
#4 |
300MW |
6477.95 |
22320 |
29 |
24.2 |
|
|
| 小计 |
30.19 |
22.13 |
|
|
| 20万千瓦≤单机容量<30万千瓦 |
| 20 |
董箐电厂 |
#1 |
220MW |
16023.98 |
16368 |
98 |
35.72 |
|
|
| 21 |
#2 |
220MW |
16114.74 |
16368 |
98 |
36.02 |
|
|
| 22 |
#3 |
220MW |
16148.11 |
16368 |
99 |
67.01 |
|
|
| 23 |
#4 |
220MW |
16070.87 |
16368 |
98 |
62.4 |
|
|
| 24 |
光照电厂 |
#1 |
260MW |
8588.45 |
19344 |
44 |
15.74 |
|
|
| 25 |
#2 |
260MW |
7541.68 |
19344 |
39 |
11.46 |
|
|
| 26 |
#3 |
260MW |
7638.62 |
19344 |
39 |
13.93 |
|
|
| 27 |
#4 |
260MW |
6895.8 |
19344 |
36 |
14.24 |
|
|
| 28 |
天二电厂 |
#1 |
220MW |
7243.81 |
16368 |
44 |
35.91 |
|
|
| 29 |
#2 |
220MW |
5492.96 |
16368 |
34 |
33.26 |
|
|
| 30 |
#3 |
220MW |
7702.5 |
16368 |
47 |
36.81 |
|
|
| 31 |
#4 |
220MW |
6008.43 |
16368 |
37 |
32.1 |
|
|
| 32 |
#5 |
220MW |
16207.34 |
16368 |
99 |
30.1 |
|
|
| 33 |
#6 |
220MW |
3794.29 |
16368 |
23 |
36.52 |
|
|
| 小计 |
58.69 |
28.79 |
|
|
| 12.5万千瓦≤单机容量<20万千瓦 |
| 34 |
鲁布革电厂 |
#1 |
150MW |
10690.84 |
11160 |
96 |
27.65 |
|
|
| 35 |
#2 |
150MW |
10873.78 |
11141.7 |
98 |
28.25 |
|
|
| 36 |
#3 |
150MW |
10380.31 |
11160 |
93 |
27.78 |
|
|
| 37 |
#4 |
150MW |
10625.11 |
11029.95 |
96 |
34.42 |
|
|
| 小计 |
95.68 |
29.5 |
|
|
| 水电合计 |
54.03 |
26.26 |
|
|
| 核电机组 |
| - |
- |
- |
|
|
|
|
|
|
|
| 核电合计 |
|
|
|
|
| 总计 |
60.15 |
48.36 |
|
|
| 单位负责人: |
张文峰 |
审核人: |
李翔 |
|
填报人: |
龙云 |
| 单位盖章: |
|
填报时间: |
2010年8月10日 |
1.计划检修小时数、本月临时非计划停运小时数、等效停运小时数概念及计算方法详见《关于印发南方区域发电厂辅助服务管理及并网运行管理实施细则的通知》(南方电监市场〔2009〕5号)。
2.机组等效可用负荷率=机组发电量/机组发电能力
其中:1)机组发电能力=机组容量×扣除计划检修小时数、本月临时非计划停运小时数、等效停运小时数后的实际机组可用运行时间
2)因系统需要由调度机构安排停机备用的机组视同可用。
3.小计(合计、总计)栏对应机组等效负荷率和累计机组等效负荷率的加权平均值。
4.装机类型为燃气、燃油、水电、核电机组的以厂为单位填报。
5.机组停机超过24小时的视作冷备